BENGALURU: The elevated section of Namma Metro's Pink Line opened to the public at 6 am on Saturday, November 14, a day after Prime Minister Narendra Modi inaugurated it and rode a train with Karnataka Chief Minister D K Shivakumar.

The line recorded 33,409 entries between 6 am and 8 pm on the first day, according to Bangalore Metro Rail Corporation figures reported by Prajavani and Deccan Herald. Jayadeva Hospital station, where passengers can change to the Yellow Line serving Electronic City, accounted for 18,714, more than three times its previous Saturday average of 5,969. Kalena Agrahara recorded 4,944.

The 7.5-km stretch runs from Kalena Agrahara to Tavarekere through six stations: Kalena Agrahara, Hulimavu, IIM Bangalore, JP Nagar 4th Phase, Jayadeva Hospital and Tavarekere. It cost about Rs 34.7 billion, the Pioneer reported. Trains run every eight minutes at weekday peak hours and every 10 minutes at other times. The Bengaluru Metropolitan Transport Corporation started 28 feeder buses on five routes, making 401 trips a day, to areas such as Uttarahalli, Singasandra and Begur.

The full Pink Line is 21.25 km long with 18 stations. Its 12-station underground section, up to Nagawara, is still being built, and BMRCL is aiming for May 2027. "On the dot at 6 am, the Pink Line services have commenced," said Bengaluru Development Minister Krishna Byre Gowda, who took the first ride. Mr Modi said the city's metro network had grown from 17 km in 2014 to more than 100 km.

Deccan Herald, Nov 14 - Urban Acres - The Pioneer, Nov 13 - Public TV