Case Study - Copenhagen's Cloudburst Plan
On July 2, 2011, about 150 mm of rain fell on Copenhagen in under two hours. About 50,000 homes lost heat for a week and insurers received more than 90,000 claims. Damage estimates differ: C40 gives more than USD 910 million, the American Society of Landscape Architects (ASLA) upwards of USD 1 billion.
The council adopted a Cloudburst Management Plan in 2012, covering seven catchments and 300 projects planned over 20 years. Its target is protection against a 100-year rainfall. In one catchment, planners compared two options for Sankt Jorgens Lake. The conventional option kept the lake unchanged and added a 5 m pipe to the harbour. The blue-green option lowered the lake by 3 m to create 40,000 cubic metres of storage, with a 2.5 m tunnel for overflow. ASLA's award entry puts the cost of doing nothing at about USD 60-90 million a year until 2110.
Chart - The Copenhagen Comparison
Source: ASLA award entry, 2016; analysis not independently audited
India Desk - Bengaluru And Chennai
Bengaluru. At Nallurhalli lake, Jana Urban Space, CDD India, Mercedes-Benz Research and Development India and the city's stormwater and lakes departments added trash barriers at three inlets, 48 sq m of floating wetlands and a 120 m planted outlet channel in 2024-25. The project team reports that outlet drain capacity rose from 35 to 91 million litres a day. Monitoring in late 2025 showed lower BOD and coliform levels, but the published page gives no values.
Chennai. Kadapakkam Lake is being dredged and deepened with a USD 6.88 million Global Environment Facility grant, supported by the Asian Development Bank. Lower flood risk and groundwater recharge are expected benefits; no measured results are published yet. UrbanShift says the city has restored more than 210 lakes and ponds.
Reading List
ASLA: Copenhagen Cloudburst Plan. The options and costs, with drawings.
India Water Portal: WRI India on 10 cities. Satellite trends in water and green cover.
Deely et al., Land Use Policy, 2020. A framework for spotting barriers across a project's life.