BENGALURU: The Commissioner of Metro Railway Safety, Southern Circle, on October 28 authorised passenger operations on the 7.38-km elevated section of Namma Metro's Pink Line between Kalena Agrahara and Tavarekere, Daily Jagran reported. The six stations include Jayadeva Hospital, an interchange with the Yellow Line, and the section takes the network to 103.6 km. Chief Minister D.K. Shivakumar said the Prime Minister was expected in Bengaluru on November 15 and was likely to open the line then. A speed trial reached 90 km/h on October 27.
Separately, BMRCL is studying eight corridors totalling about 215 km for a fourth phase, the longest a 59.9-km extension to Tumakuru, Oneindia reported. A 34-km underground Inner Ring Metro proposed by the Indian Institute of Science is not on the list. No cost or timeline has been published.

