BENGALURU: Karnataka Chief Minister D.K. Shivakumar has written to Prime Minister Narendra Modi asking him to fix a date to open the first section of Namma Metro's Pink Line, a 7.5-km elevated stretch with six stations: Kalena Agrahara, Hulimavu, IIM Bangalore, JP Nagar 4th Phase, Jayadeva Hospital, an interchange with the Yellow Line, and Tavarekere. If the Prime Minister cannot attend, the state is considering opening it on November 1, Karnataka Rajyotsava, according to local reports.
The Commissioner of Metro Rail Safety inspected the line from October 6 to 8 and raised 36 observations; BMRCL filed its compliance on October 15. No authorisation or opening date had been confirmed by October 26. The section would take Namma Metro to 103.6 km, which Vartha Bharati describes as the country's second-largest metro network. Trains are six-car BEML sets with Alstom CBTC signalling, provisionally cleared for semi-automatic running at up to 80 km/h. The full Pink Line is 21.26 km, of which 13.76 km is underground; trials on the underground section from Dairy Circle to Nagawara are expected to begin in November.
Vartha Bharati, Oct 17 - Metro Rail News - Swarajya

