CHENNAI: Chennai Metro's second phase has carried its first paying passengers. Prime Minister Narendra Modi and Chief Minister C. Joseph Vijay opened the elevated Yellow Line on October 11 and rode it together; paid service began at 4 pm and logged 25,474 journeys in its first five hours.

The 15-km line (14.64 km by the operator's measure) runs from Poonamallee Bypass to Vadapalani through 11 stations, including Porur Junction and Iyappanthangal, and joins Phase I at Vadapalani. It cost about Rs 49 billion and carries a 3.7-km double-decker viaduct over one of the city's busiest corridors. Trains run from 7 am to 9 pm, every 10 minutes at weekday peaks and every 15 minutes otherwise, with fares from Rs 10 to Rs 40.

The fleet is 36 three-car Alstom Metropolis trains from Sri City, with Hitachi Rail signalling; driverless running is expected in mid-2027. The stretch is the first section of a much larger programme. Phase II covers 118.9 km and 128 stations across three corridors, approved by the Ministry of Housing and Urban Affairs at about Rs 630 billion, with completion targeted for end-2028. On the same visit the Prime Minister dedicated projects worth more than Rs 130 billion.

Bengaluru's Pink Line is still waiting on its safety clearance, and Mumbai's first driverless Line 4 train has only just left the factory (both).

Sources: Railway Gazette International, Oct 13 - DT Next